Commissioned: | 2019 |
Owner: | Vattenfall |
Production capacity: | 295 MW |
Annual yield: | 1.3 TWh |
Turbines: | 82 x Nordex, type N117/3600 |
Turbine power: | 3,675 MW |
Hub height: | 118 m |
Tip height: | 177 m |
Rotor diameter: | 117 m |
Cables: | |
Client stations: | 15 |
Connected to the grid at: | At Agriport A7 business park in Middenmeer. Liander/TenneT |
Main contractors: | BAM Infra, Van Gelder |
Power purchasers: | Microsoft |