Commissioned: 2019
Owner: Cooperatives Zeeuwind and Deltawind (60%) & Kallista Energy (40%)
Power: 102 MW
Turbines: 34 x Enercon, type E-115
Turbine power: 3 MW
Hub height: 122 m
Tip height: 180 m
Rotor diameter: 115.7 m
Cranes: Liebherr type 1000 EC-B 125
Cables: Prysmian
Connected to the grid at: 150kV Station in Middelharnis (TenneT)
Contractors: Enercon (main contractor), GMB (civil works), Van Vulpen (cables), Alsema (cables), Gebr. De Koning B.V. (foundations)
Power purchasers: DSM, Google, Nouryon and Philips