Commissioned: | 2019 |
Owner: | Cooperatives Zeeuwind and Deltawind (60%) & Kallista Energy (40%) |
Power: | 102 MW |
Turbines: | 34 x Enercon, type E-115 |
Turbine power: | 3 MW |
Hub height: | 122 m |
Tip height: | 180 m |
Rotor diameter: | 115.7 m |
Cranes: | Liebherr type 1000 EC-B 125 |
Cables: | Prysmian |
Connected to the grid at: | 150kV Station in Middelharnis (TenneT) |
Contractors: | Enercon (main contractor), GMB (civil works), Van Vulpen (cables), Alsema (cables), Gebr. De Koning B.V. (foundations) |
Power purchasers: | DSM, Google, Nouryon and Philips |