Status: | Commissioned in 2015 |
Location: | 23 km off the coast of Noordwijk & Zandvoort |
Owner: | Eneco & Mitsubishi |
Production Capacity: | 129 MW |
Annual yield: | 531,000,000 kWh |
Turbines: | 43 x Vestas, type V112 |
Turbine power: | 3 MW |
Hub height: | 81 m |
Tip height: | m |
Rotor diameter: | m |
Foundation piles: | Monopiles, average length of 70 m, 5 m diameter, 525 tonnes weight. Produced by Sif Group in Roermond |
Transition pieces: | |
Inter-array cables: | 33 kV, by LS Cable & System in Korea |
Export cables: | 150kV, 25 km length |
Main vessels used: | Aeolus, Ndurance, Rambiz, HAM 602 (50 vessels in total) |
Grid operator: | TenneT |
Substation offshore: | 1, on monopile foundation. Topside built by FICG consortium (Cofely Fabricom, Iemants & CG) in Antwerpen, Belgium |
Substation onshore: | In Sassenheim (TenneT) |
Maintenance port: | IJmuiden |
Contractors: | Van Oord (main), VSMC (Volker Wessels, Boskalis), Scaldis (topside OHVS), Joulz (onshore cable route) |
Power purchasers: | TU Delft, NS, KPN, Qurios & others |