Status:Commissioned in June 2016, part of the Noordoostpolder Wind Farm
Location:In the IJsselmeer lake, at 700 to 1.200 m distance from the Noordermeerdijk and Westermeerdijk near Urk. In water depths between 4-7 m.
Owner:Westermeerwind B.V.
Production Capacity:144 MW
Annual yield: 500 GWh
Turbines: 48 x Siemens, type SWT 3,0-DD
Turbine power:3 MW
Hub height: 95 m
Tip height: 149 m
Rotor diameter: 108 m
Foundation piles: TP-less monopiles by SIF Group in Roermond. Length: app. 35 m, Diameter: 5 m. Weight: 300 t.
Inter-array cables: 40 in Norway
Export cables: 6
Main vessels used: De Schelde (installation)
Substation onshore:110 kV station by Siemens Energy Transmission
Grid operator:The wind farm is connected to the national grid at TenneT’s high voltage station at the Westermeerdijk.
Ports used: Amsterdam, Oude Zeug, Urk, Vlissingen during construction. Maintenance port: Lemmer
Main contractors: Siemens Wind Power (turn key), Ventolines B.V. (construction supervision and business operation),
Van Oord/Mammoet (foundation & turbine installation), VBMS (VolkerWessels Boskalis Marine Solutions) (cables), H&D Civiel BV (civil works)
Power purchasers:Eneco