Location: 85 km off the coast of Groningen
Owner: Northland Power (60%), Siemens (20%), HVC (10%) and ALTE LEIPZIGER/HALLESCHE (10%).
Production Capacity: 600 MW
Commissioned: 2017
Turbines: 150 x SG 4.0-130 by Siemens Gamesa
Turbine power: 4 MW
Hub height: 88.5 m
Tip height: m
Rotor diameter: 130 m
Blades: B63, 63-metre blades
Foundation piles: monopiles
Average length:59-73 m
Transition pieces:
Inter-array cables: 33 kV
Export cables: 230 kV, 30 cm diameter, 3 sections: 95, 10 en 103 km.
Vessels used: Nexus, Jan Steen (cables), Aeolus, Windea la Court (O&M)
Grid operator: TenneT
Substation offshore: 2, on jacket foundations, built by FICG consortium
(Cofely Fabricom, Iemants & CG) in Hoboken, Belgium
Substation onshore: Eemshaven
Maintenance port: Eemshaven
Contractors: Van Oord