Location: 23 km off the coast at Westkapelle, site size: 112 km2. Water depth 14-36 m
Owner: Ørsted (50%) & Norges Bank Investment Management (50%)
Power: 752 MW
Commissioned: 2020
Turbines: Siemens Gamesa, SG 8.0-167 DD
No turbines: 94
Turbine power: 8 MW
Hub height: m
Tip height: 200 m
Rotor diameter: 167 m
Blades: m
Foundation piles: Sif & EEW SPC
Transition pieces: Bladt, & EEW OSB
Inter-array cables: 66 kV, Nexans
Export cables:
Grid operator: TenneT
Substation offshore: Borssele Alpha, built by HSM Offshore (Schiedam)
Substation onshore: 380 kV high-voltage station in Borssele
Maintenance port: Vlissingen
Contractors: DEME Offshore (turbines & Foundations)
Van Oord (cables