Location: | 23 km off the coast at Westkapelle, site size: 112 km2. Water depth 14-36 m |
Owner: | Ørsted (50%) & Norges Bank Investment Management (50%) |
Power: | 752 MW |
Commissioned: | 2020 |
Turbines: | Siemens Gamesa, SG 8.0-167 DD |
No turbines: | 94 |
Turbine power: | 8 MW |
Hub height: | m |
Tip height: | 200 m |
Rotor diameter: | 167 m |
Blades: | m |
Foundation piles: | Sif & EEW SPC |
Transition pieces: | Bladt, & EEW OSB |
Inter-array cables: | 66 kV, Nexans |
Export cables: | |
Grid operator: | TenneT |
Substation offshore: | Borssele Alpha, built by HSM Offshore (Schiedam) |
Substation onshore: | 380 kV high-voltage station in Borssele |
Maintenance port: | Vlissingen |
Contractors: | DEME Offshore (turbines & Foundations) Van Oord (cables |