Status: Operational since 2012 (repowering project: previous wind farm from 2002 featured 8 turbines).
Location: Dronten, Province of Flevoland
Owner: Pure Energie
Production capacity: 13.8 MW
Annual yield: 23,100,000 kWh
Turbines: 6 x Enercon E70
Turbine power: 2.3 MW
Hub height: m
Tip height: 105 m
Rotor diameter: 71 m
Blades: m
Cables:
Substation:
Connected to the grid at:
Project management:
Contractors:
Power purchasersGreenchoice
Wind farm website

Input your search keywords and press Enter.