Commissioned: | Under construction |
Owner: | Vattenfall (4 turbines) & Windpark Gooyum Houw B.V. (5 turbines) |
Production capacity: | 42 MW |
Annual yield: | TWh |
Turbines: | 9 x Enercon, type |
Turbine power: | MW |
Hub height: | m |
Tip height: | 177 m |
Rotor diameter: | m |
Cables: | |
Substations: | |
Connected to the grid at: | Liander |
Main contractors: | |
Power purchasers: |