Hollandse Kust West (Ecowende)

Status:Under development. The wind farm is scheduled to be operation at the end of 2026
Location:Approximately 53 kilometres off the coast from IJmuiden, province of Noord-Holland. effecive area 90 km2, water depths 26 – 30 m
Owner:Ecowende: Shell, Eneco & Chubu Electric Power
Production Capacity:760 MW
Annual yield: Around 3.3 TWh
Turbines: 52 x Vestas V236-15.0 MW
Turbine power:15 MW
Hub height:
Tip height:
Rotor diameter:
Foundation:TP-less Monopiles – by Sif Group
Towers:
Inter-array cables: TKF
Export cables:
Main vessels used: Installation vessel Boreas, cable layer Nexus
Grid operator: TenneT – Hollandse Kust (west) Alpha connection
Substation offshore: 700 MW
Substation onshore: In Wijk aan Zee
Base port:Eemshaven
Main contractors: Van Oord -transport and installation of foundations, wind turbines and inter-array cables,
Power purchasers:Plukon and De Heus, Albert Heijn
Additional features:The tender process for HKW lot VI was groundbreaking, as applications were assessed on their contribution to the ecology of the North Sea. Some of the ecological features/measurements include:
– GBM Works’ innovative noise reducing technology Vibrojet® will be used for installing 3 monopiles,
– Waardenburg Ecology and Ecowende are developing a comprehensive ecological programme
– monitoring programme for flying birds and bats by Robin Radar Systems, MIDO and DHI
– HUB Ocean’s Ocean Data Platform to make ecology data publicly accessible