Commissioned: | Decommissioned wind farm from 2003. Location: Municipality of Kapelle, province of Zeeland |
Owner: | Coöperatie Zeeuwind, Triodos Bank en Ronnie Rijk |
Production capacity: | MW |
Annual yield: | 17,800,000 kWh |
Turbines: | 10 x NEG-Micon NM52 |
Turbine power: | 9,000 kW |
Hub height: | 70 m |
Tip height: | m |
Rotor diameter: | 52 m |
Main contractors: | |
Additional info: |