Status: | Under construction, commissioning planned for end 2025. Location: Municipality of Kapelle, province of Zeeland |
Owner: | Coöperatie Zeeuwind, Triodos Bank en Ronnie Rijk |
Production capacity: | 18 MW |
Annual yield: | GWh |
Turbines: | 4 x Vestas V150 |
Turbine power: | 4.5 MW |
Hub height: | m |
Tip height: | m |
Rotor diameter: | m |
Main contractors: | Vestas (turbines), GMB (foundations), Van den Heuvel Infrastructuur voor Water & Energie (cabling and connection), Lighthouse Projects BV (project/construction/site management) |
Additional info: | Repowering project, replacing 10 NEG Micon twind urbines from 2003 |