Havfram’s new WTIVs to feature Huisman’s controlled blade installation system
Huisman has received an order for the delivery of a Traveling Load Stabilising System to be used in Havram’s two new Wind Turbine Installation Vessels. The system enables Havram to stabilise wind turbine components during installation. Huisman’s system will be...