TenneT to deploy 2 GW DC connections at IJmuiden Ver
TenneT will be responsible for connecting 6.GW of new offshore wind between 2024 and 2030. This brings the total to 9.6 GW. Of this, 5,6 GW is linked using alternating current and 4 GW with 2GW direct current connections. TenneT...